09/01/2013
RANS S-20 RAVEN
TEXT MANUAL
00-45
S-20 WINGS – PRE-COVERING ASSEMBLY
Refer to Section 5 and complete the following items:
•
WING - MAIN STRUCTURE ASSEMBLY
o WING SPAR ASSEMBLY
o WING FRAME ASSEMBLY
•
FUEL TANK ASSEMBLY AND INSTALLATION
o ASSEMBLY
o INSTALLATION
o FUEL CAP ASSEMBLY
•
AILERON BELL CRANK AND CABLE INSTALLATION WING
•
WING – RIB & SHEET METAL INSTALLATION
o WING RIB ASSEMBLY
o WING RIB INSTALLATION
o RIB STRINGER INSTALLATION
o UPPER AND LOWER ROOT SKINS
o LEADING EDGE TIP WRAP
o LEADING EDGE WRAP
o PITOT AND STATIC SYSTEM INSTALLATION
o FLAP TELEFLEX CABLE INSTALLATION
•
AILERON AND FLAP ASSEMBLY AND INSTALLATION
o ASSEMBLY
•
COVERING
(Refer to Section 7)
•
ROOT SKIN INSTALLATION
o FIT UP
PAINTING
(Manual does not provide guidance for painting)