ROTAX 912 ULS - CHOKE CONTROL ASSEMBLY
(FINAL INSTALL OF ENGINE)
ASSEMBLY
•
The engine needs to be installed to the airframe.
•
Instrument Sub-panel must be installed
1.
Refer to the parts catalog and select the required components for assembly.
Refer to Manufacturer's instructions.
2.
Remove lock washer and retaining nut from Throttle Cable Assembly.
3.
Route Cables through right side hole in Instrument Sub-panel. Secure with lock
washer and retaining nut.
4.
Install Rubber Grommets to upper set of 5/16" holes below Regulator Rectifier on
Firewall and route cables through.
5.
Route cables to each Carburetor leaving slack to allow for engine movement and
maintenance of carburetor.
NOTE:
Choke Control can be pulled out slightly to allow trimming of
Control Cable housings.
6.
Cut provided Blue Line into segments and secure with Plastic Ties to secure the
Throttle and Choke Cable housings together.
7.
Insert Barrel Stop into choke control arm and thread Control Cable through.
Refer to
FIGURE 11G-07/912
. Adjust to allow full off (down) position when
control is pushed all the way in and tighten Set Screw in Barrel Stop.
HINT:
Turn Adjustable Ferrule out slightly to allow easier adjustment. Lock
Adjustable Ferrule with lock nut.
8.
Safety wire Cable housing to Adjustable Ferrule and check for operation.