S-7S COURIER - GENERAL INFORMATION
INTRODUCTION
As the builder of the S-7S COURIER kit you are considered the manufacturer by law.
The rules state that you must build 51% of the total. In essence, we are your parts
supplier. You have the final say in regard to every single item that goes into your project.
The responsibility of making a safe aircraft is on your shoulders. It is by your hand this
box of parts becomes an aircraft. Set up your quality assurance and construction activity
according to the level of risk you are willing to take. The manual provided is to be
thought of as a suggested guidebook. Use the book, but learn to think things through.
This will minimize errors and reduce build time.
BEFORE BEGINNING ASSEMBLY
TAKE INVENTORY:
You must complete an inventory within 60 days of
receiving your kit.
We check and re-check and are 99.9% certain that if we say we shipped it, we did. The
first task in building your kit is to inventory the parts using the packing list provided. It is
your job to keep all parts organized and accounted for. We cannot provide missing parts
cost free after 60 days. Use the supplied pack list to verify that everything that we
packed is in the box. The fast way to inventory is to use the Priority Number that appears
on the Part Number labels, these will match the pack list in numeric order. Go through
the list item by item. If anything is not there that should be, please contact our parts
department immediately.
HINT: Use sections of plywood from the packing crate to
fabricate a part inventory board. As each part is inventoried and checked off on the pack
list, staple the bag to the board. This allows for quick identification and part selection
during assembly. We fabricate “A” Frame stands to support the plywood. Refer to
FIGURE 0-01. Plywood can also be attached to shop walls.
IMPORTANT:
When hanging the parts on the board, use the aircraft section
designator of the part number to organize the parts. For an explanation of the part
number and the meaning of the letters in the prefix refer to ENGINEERING DEPT.
DRAWING NUMBERING SYSTEM.
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......