06/15/2011
07A-01
WINGS
1.
Clean the entire frame thoroughly. Blow out all Ribs and Wing Spars to
remove metal shavings.
2.
Scotch-Brite all sheet metal surfaces and clean with Acetone.
3.
Cut out the 2 formed Bolt Covers to lay flat against the Leading Edge Spar
and to cover the 3 FWD Strut Attach Plate Bolts. Glue on Bolt Covers.
4.
Apply anti-chafe tape around sharp edges (masking tape). Refer to
FIGURE 07A-04.
5.
Apply one coat of thinned U-500 to the sheet metal using a soft wide
brush, let dry. The thinned U-500 applied to the metal under surfaces
helps prevent pin-holing in the paint finish. Make sure to remove brush
hairs from the surface if necessary.
6.
Perform pre-covering check using the following items.
Assembly completed as per parts manual
Aileron cables installed
Flap Teleflex Cable installed
Fuel and drain lines installed
Fuel system leak tested
Pitot and static lines installed (left wing only)
All nut plates for hinges installed
Door Upcatch Socket installed
Jury strut attach bracket installed
Strobe wiring installed (optional)
Anti-chafe tape installed around sharp edges of sheet metal
Anti-chafe (Longeron Fairing material) installed to Drag Brace
Bolt cover glued over the 3 FWD Strut Attach Plate Bolts
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......