AILERONS AND FLAPS
1.
Use a light hammer and form AFT ends of ribs to follow contour of trailing
edge spar.
2.
Clean the entire frame thoroughly with Acetone or similar.
3.
Apply anti chafe tape around sharp edges of ribs (masking tape) as shown
in
FIGURE 07B-03
.
4.
Perform pre-covering check using the following items.
Nut plates for hinge points (Flap) installed.
Anti-Chafe tape applied around sharp edges of ribs.
5.
Cut fabric large enough to fit frames as shown in
FIGURE 07B-05
.
6.
NOTE: The fabric is glued around the Leading Edge Spar, wrapped
around the Trailing Edge Spar and than glued to the Leading Edge Spar.
7.
The fabric should extend past both ends of frames about 2”.
8.
Glue fabric to Leading Edge Spars, (cut out to clear ribs) let dry and iron
edges down.
9.
Wrap around Trailing Edge and glue to Leading Edge. Refer to
FIGURE
07B-05
.
10.
Cut and glue fabric around both ends of frames (overlap fabric).
11.
Let dry and final iron entire surface for tightening of fabric.
12.
Apply Drain Grommets (to the bottom side), patches, and tapes (in this
order).
13. Refer
to
FIGURE 07B-13
for Ailerons.
14. Refer
to
FIGURE 07B-14
for Flaps.
15.
Iron along tapes and iron down tape edges.
16.
The Ailerons and Flaps are now ready for primer and paint.
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......