06/12/03
07D-02
14.
Use a hot knife with a pointed tip or a soldering iron and melt through the
cover strap and the fabric into the rib holes.
15.
Cut the melted build up on top of the Lexan straps off using a razor blade.
16.
Insert a rivet in each hole and rivet.
17.
Apply drain grommets (to the bottom side), patches, and tapes (in this
order).
18. Refer
to
FIGURE 07D-18
.
NOTE: Only the right horizontal stabilizer
receives a seaplane grommet on the bottom side.
The opening must face
AFT. The trim wiring will exit there.
19.
Iron along tapes and iron down tape edges.
20.
The Horizontal stabilizers are now ready for primer and paint.
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......