09/01/2014
07E-01
RUDDER
1.
Clean the entire frame thoroughly.
2.
Perform pre-covering check using the following items.
Hinge stop collars set and riveted.
Rudder frame primed.
NOTE: Both sides of the rudder are covered with a separate piece of fabric.
3.
Cut fabric large enough to fit the frame and with enough excess to allow
gluing around the frame tubes all the way around.
4.
It does not matter which side you apply first.
5.
Glue fabric (first side) all the way around the frame tubes well past the
centerline of the tubes. Refer back to
FIGURE 07D-06
. You have to cut
the fabric in the corners and around the moving part of the hinge.
6.
Let dry and iron all fabric edges down.
7.
Pre-iron the fabric surface only enough to take wrinkles out.
8.
Glue fabric (second side) all the way around the frame tubes and past the
centerline as shown in
FIGURE 07D-06
.
9.
Let dry and pre-iron the surface only enough to take wrinkles out. Let dry
and final iron entire surface for tightening of fabric.
10.
Modify Rudder / Elevator Hinge Reinforcement per
FIGURE 07E-10
.
11.
The rudder uses a small piece of .020 Lexan as reinforcement on the
bottom forward end on both sides. Fabricate 2 from raw stock according to
FIGURE 07E-11
. Glue reinforcements on.
12.
The fabric will also need to be stitched with a single stitch to the center of
each rib. Refer to
FIGURES 07E-12, 07E-12A
and
07E-12B
for details
about stitching.
13.
Apply reinforcements, patches, and tapes (in this order). Refer to
FIGURES 07E-12, 07E-12A
and
07E-12B
.
14.
Iron along tapes and iron down tape edges.
15.
The rudder is now ready for primer and paint.
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......