11/19/02
09B-02
ELEVATOR
Neutral position
4.
In neutral position the elevators are level with the horizontal stabilizer.
Verify using a straight edge across the surface with a 3/16" shim at the
elevator trailing edge.
5.
It is possible to adjust at the connection of the elevator horns to the
push-pull tube (rod ends). A minimum of 10 full turns thread engagement
must be assured.
Deflections
6.
Determine neutral position of elevator as reference for deflection
measurement. Use a straight edge across horizontal stabilizer and
elevator with 3/16” shim at elevator trailing edge for neutral position
determination.
7.
Move stick in cockpit aft. Hold and measure deflection on elevator at
approximate half span. Adjust Forward Pitch Stop, on top of AFT 1-1/2"
Push-Pull Tube, to rest against Pitch Stop Tube at Station 6 inside
Fuselage, to obtain the listed UP deflection. Repeat with stick at forward
position and adjust Pitch Stop for DOWN deflection.
•
UP:
28
(Tolerance is +3.0
/ -0.0
)
•
DOWN:
20
(Tolerance is +3.0
/ -0.0
)
8.
Adjust Pitch Stops as needed until correct Deflections are obtained. Safety
Wire between tops of Pitch Stops and over the Pitch Stop Tube. Refer to
FIGURE 09B-08
. The Safety Wire will lessen the potential for the AFT
1-1/2" Push-Pull Tube from deflecting under load and causing the Pitch
Stops to jam the Elevators in full deflection.
Surface clearance
8.
Refer to
FIGURE 09B-09
•
The minimum clearance between elevator and horizontal stab. Is
0.060” all the way along the hinge line.
•
The minimum clearance between the elevator horn and the
horizontal stab. Tip is 3/16”.
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......