09/01/2014
03B-02
CHOKE INSTALLATION
11.
Determine the cable housing routing and cut to length. Note: Cable housing
routing is left to the discretion of the builder.
12.
Route the choke cable housing.
13.
Operate the choke lever to verify free movement. It is important that the
choke operates smoothly and completely returns to its run position. If any
drag is noticed or if the choke lever does not return completely, remove the
choke lever and arm and apply a light film of grease to the arm. Consult the
Rotax parts manual for a break down of the choke system.
14.
Cut the “T” shaped swagged end off of each choke cable.
CAUTION: The
barrel end must remain in place for attachment to the choke lever on the
carburetor.
See
FIGURE 03-09
.
15.
Install the barreled end of the choke cables into the choke lever on the
carburetor. It may be necessary to lightly file the barrel in order to insert it
into the choke lever. The barrel should rotate within the lever. See
FIGURE
03-09
.
16.
With the barrel installed in the choke lever, feed the cable through the choke
cable guide and cable housing. Pull all slack out of the cable where it exits
the aft side of the firewall.
17.
Install the push pull choke cable into the instrument panel. For installation of
control knob in instrument panel refer to
FIGURE 01I-12
and
09D-06.
18.
The choke mixer plate should be located approximately 1 1/2" aft of the
firewall. Cut the choke cables from the carburetors to length and attach them
to the mixer plate using the wire swivel stops. Leave plenty of cable length
for adjustment.
19.
Remove the inner cable from the push pull choke cable housing and cut the
housing to length. The housing should be cut short enough to allow full travel
of the mixer plate.
20.
Install the push pull cable and cut to length. Leave plenty of length for
adjustment.
21.
Attach the push pull cable to the mixer plate. Don’t forget to install the friction
block.
NOTE: It is recommended to bend the steel wire ends (control cable)
90 degree past the cable swivel stop to avoid slipping out.
22.
With the push pull knob completely in, adjust all slack out of the cables at the
choke mixer plate.
23.
For final adjustment refer to
RIGGING
.
24.
Loctite the set screws in the wire swivel stops.
25.
Safety-wire the cable housings into the adjustable ferrules. Secure all throttle
and choke cable housings where necessary.
Summary of Contents for S-7S COURIER
Page 26: ...RIVETS CROSS REFERENCE LIST...
Page 28: ...1 T E 0703 TI ON 1 9 1 I I 8 T d 3 d d 0 3 OE O N t Z...
Page 44: ...09 01 2014 01E 02 FINAL INSTALLATION For final installation refer to RUDDER PEDAL INSTALLATION...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 157: ......
Page 195: ......
Page 196: ......
Page 197: ......