20 Operation
Blower Speed
Use the “Blower SPEED” dial to set the air flow inside the shrink tunnel.
The blower speed will vary according to the product dimensions and film
properties.
Conveyor Speed
Use the “Conveyor SPEED” dial to set the conveyor speed through the
shrink tunnel. The conveyor speed will vary according to the product
dimensions and film properties.
Sealer Operation
Seal Time
Use the “Seal TIME” timer to set the seal time. The seal time is the amount of time that
the magnets will hold the seal head down on the film. The seal time may vary according
to the type of film in use.
When the seal bar frame is pressed down onto the film, it will
remain in position for the set time then automatically release. Do
not hold the seal bar down onto the film.
Ensure that the timer sliding switches are in the times one (X1)
and the second (Sec) positions. If the timing switches are in the
X10 and or the minute positions it will result in a ridiculous value
that is way out of operating range.
Attention!
Move the “Seal TIME” switch in very small
increments.
Summary of Contents for Eastey Value Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 29: ...Electrical Schematic 29 Electrical Schematic...
Page 30: ...30 Electrical Schematic Electrical Schematic Continued...
Page 31: ...Illustrated Parts List 31 Illustrated Parts List...
Page 32: ...32 Illustrated Parts List...
Page 33: ...Illustrated Parts List 33...
Page 34: ...34 Illustrated Parts List...
Page 35: ...Illustrated Parts List 35...
Page 36: ...36 Illustrated Parts List...
Page 37: ...Illustrated Parts List 37...
Page 38: ...38 Illustrated Parts List...
Page 39: ...Illustrated Parts List 39...
Page 40: ...40 Illustrated Parts List...
Page 41: ...Illustrated Parts List 41...
Page 42: ...42 Illustrated Parts List...
Page 43: ...Illustrated Parts List 43...
Page 48: ......
Page 49: ......