Maintenance 23
Maintenance
The Eastey L-Bar Sealer Tunnel Combo machine will provide many hours of
maintenance-free operation and requires very little maintenance for normal operation.
There are a few items that may require attention from time to time.
Attention!
Any maintenance beyond normal cleaning and lubrication
should only be performed by trained and qualified personnel.
Sealer
Daily
Clean the seal band.
Ensure the Teflon tape is not torn or missing on upper and lower seal areas.
Replace as needed.
Check conveyor belt for tears.
Check the conveyor height adjustment wheel. Lubricate chain and screws as
needed.
Check power cord and wiring for wear and loose connections.
Check for loose fasteners.
Shrink Tunnel
Daily
Inspect the silicone rollers. Repair or replace as needed.
Check mesh belt for material stuck on or in belt. Clean if necessary.
Monthly
Check and clean the air intake screens.
Check the airflow holes inside the tunnel for debris and clean if necessary.
Check and adjust the conveyor tension.
Lubricate the drive chains.
Summary of Contents for Eastey Value Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 29: ...Electrical Schematic 29 Electrical Schematic...
Page 30: ...30 Electrical Schematic Electrical Schematic Continued...
Page 31: ...Illustrated Parts List 31 Illustrated Parts List...
Page 32: ...32 Illustrated Parts List...
Page 33: ...Illustrated Parts List 33...
Page 34: ...34 Illustrated Parts List...
Page 35: ...Illustrated Parts List 35...
Page 36: ...36 Illustrated Parts List...
Page 37: ...Illustrated Parts List 37...
Page 38: ...38 Illustrated Parts List...
Page 39: ...Illustrated Parts List 39...
Page 40: ...40 Illustrated Parts List...
Page 41: ...Illustrated Parts List 41...
Page 42: ...42 Illustrated Parts List...
Page 43: ...Illustrated Parts List 43...
Page 48: ......
Page 49: ......