21.6 Safety Shut Off Valve Check
After the initial start
u
p and gas press
u
re adj
u
stment,
v
erify gas so
u
ndness of each SSOV (Safety Sh
u
t Off
Val
v
e). This check m
u
st be repeated after the first
100 ho
u
rs of operation.
21.7 Temperature Control System Calibration
The temperat
u
re control system components are
factory calibrated to a base resistance so that
component replacement
w
ill not
u
pset the system
calibration. If the temperat
u
re control system sho
u
ld
req
u
ire field calibration, refer to the pro
v
ided
temperat
u
re control amplifier prod
u
ct information
sheet.
Table 3
8
: Maximum Temperature Rise
SC11 Signal
Conditioner
Set BMS to max fire or
remo
v
e inp
u
t
w
ires from
terminals #6 and #5 and
connect a 9VDC battery to
the signal conditioner
Remo
v
e from terminal
#1 on the
signal conditioner
Series 94
Disconnect selector ribbon
cable from the amplifier.
Remo
v
e
w
ire from ter-
minal #2 on the ampli-
fier
Series MP2
Set system to maxim
u
m
temperat
u
re
Remo
v
e
w
ire from ter-
minal #2 on the amplifer
Model
Natural Gas
LPG
°F
°C
°F
°C
2005
90
50
80
44.5
2010 - 2030
110
61.1
90
50
Summary of Contents for 4044
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 73: ...SECTION15 VIBRATION ISOLATION 65 of 154 FIGURE 52 Curb Mounted Roof Curb Roof Curb...
Page 109: ...SECTION19 ELECTRICAL 101 of 154...
Page 110: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 102 of 154...
Page 111: ...SECTION19 ELECTRICAL 103 of 154...
Page 112: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 104 of 154...
Page 113: ...SECTION19 ELECTRICAL 105 of 154...
Page 114: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 106 of 154...
Page 115: ...SECTION19 ELECTRICAL 107 of 154...
Page 116: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 108 of 154...
Page 117: ...SECTION19 ELECTRICAL 109 of 154...
Page 118: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 110 of 154...
Page 119: ...SECTION19 ELECTRICAL 111 of 154...
Page 121: ...SECTION 20 DIRECT FIRED BURNER 113 of 154 FIGURE 71 Midco HMA 2A Burner...
Page 122: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 114 of 154...
Page 125: ...SECTION 20 DIRECT FIRED BURNER 117 of 154...
Page 126: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 118 of 154...
Page 127: ...SECTION 20 DIRECT FIRED BURNER 119 of 154 20 3 Honeywell UV Flame Detector...
Page 160: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 152 of 154...
Page 161: ...SECTION 27 THE RAPID 4000 SERIES WARRANTY 153 of 154...
Page 162: ...4000 SERIES INSTALLATION OPERATION AND SERVICE MANUAL 154 of 154...