background image

6

 

MAG 45 

 

 

Phone 0800 4 VOGAL (0800 486 425) 

E: 

sales@rataindustries.co.nz 

W: 

www.rataindustries.co.nz

 

 

 

INSTALLATION 

 

 

PRE-START CHECKS 

 

1.

 

Ensure that the towball on the vehicle is compatible with the spreader. The spreader is designed to 

accept a 1-7/8” diameter towball. 

 

2.

 

Check the operation of all controls. 

 
3.

 

Check the tyre pressure (10psi minimum to 25psi maximum dependant on load size).  

 

4.

 

Check the condition of the tyres. Look for signs of wear, cuts and impact damage. 

 

5.

 

Check the free operation of the shutter lever. 

 

6.

 

Check the condition of the hopper and lid. 

 

7.

 

Check that all grease points have been greased. 

 

8.

 

Check the gearbox for oil leaks, if an oil leak is evident do not use the spreader and carry out repairs 
immediately. 

 

9.

 

Check that the agitator is movable, free from debris and well greased. 

 

 

 

 

 

 

Summary of Contents for Vogal Spreadmax 45

Page 1: ...machine provided you are registered with Rata Industries within 14 days of the purchase date Warranty claims will only be processed upon receipt of proof of purchase and warranty registration within...

Page 2: ...y Oil Level Correct In Gear Box Operators Manual Attached to Machine Checked and Test Run Alignment of Agitator is Correct Spinner Disc Spins Freely Warning Label Attached Re Drive Shaft Length and Oi...

Page 3: ...dustries co nz W www rataindustries co nz SPREADMAX MAG 45 Operation Maintenance Parts Manual Rata Industries Group Ltd Ferrier Rd Winchester South Island New Zealand Phone 0800 4 VOGAL 0800 486 425 E...

Page 4: ...ir this product subject to the conditions of this warranty This warranty excludes any transport costs or damage and excludes all normal maintenance costs Rata Industries will not pay for mileage freig...

Page 5: ...l injury during the operation of the equipment CAUTION indicates the possibility of damage to the machine 2 Carefully read and take note of the following warnings before attempting to tow or operate t...

Page 6: ...ols 3 Check the tyre pressure 10psi minimum to 25psi maximum dependant on load size 4 Check the condition of the tyres Look for signs of wear cuts and impact damage 5 Check the free operation of the s...

Page 7: ...tri knob C 2 Place the shutter lever A in the zero position and fill the hopper with the material to be spread 3 Drive to the area requiring the fertiliser engage the D pin D to the IN position and re...

Page 8: ...ially loaded in the hopper A 10kg Deduct any remaining fertiliser E 4kg Balance used 6kg Multiply width of spread D 8 metres By the metres travelled C x 200 metres 1 600sq metres Dived 10 000 by the a...

Page 9: ...idue grease and replace the agitator Ensure the retaining pin is refitted and held in place by the spring clip 6 Check the condition of the engagement mechanism and grease daily Use the following proc...

Page 10: ...ataindustries co nz REPLACEMENT PARTS 1 To order replacement parts please quote the spreader model serial number and date of purchase 2 The serial number is located on the spreader tow bar as shown be...

Page 11: ...11 MAG 45 Phone 0800 4 VOGAL 0800 486 425 E sales rataindustries co nz W www rataindustries co nz MAG 45 PARTS LIST 2 3 12 10 9 6 7 5 8 13 1 11 15 4 14...

Page 12: ...preader 2 13 SP122 007 Drive Axle 1 3 1795 Hopper Lid Yellow 1 4 2121 Gearbox RV010 1 1927 Moving Shutter 1 5 2186 Non Drive Wheel 16x650 8 1 6 2187 Drive Wheel 16x650 8 1 7 2801 Hub Cap 2 1838 Bearin...

Page 13: ...nc 2 4384 M10x120 Bolt Zinc 4 4390 M10 Washer Spring Galv 3 4395 M10 Washer Square Galv 50x50x3 3 4398 M10 Washer 24x3 HD Galv 3 4399 M10 Washer 24x3 HD Zinc 1 4453 M12 Nut Nyloc Zinc 2 4468 M12x40 Bo...

Reviews: