Page 3
Back
Front
Panel 1
Panel 2
Face Plate
Description
Safety Guidelines
• Save these instructions. This manual contains important instructions that will assist you during installation and
for maintenance.
• Keep all the components secure and protected during storage.
• Be careful of finished surfaces during transport and installation to avoid damaging the finish.
• Installation and maintenance should only be performed by qualified electricians.
• It is recommended a minimum of 2 people perform installation.
• Do not install phone during extreme weather conditions.
• Do not touch uninsulated phone wires or terminals unless the phone line has been disconnected at the
network interface.
• ADA compliant (hands free operation)
• LED call status indicator
• Powder coated steel construction inside and out
• Aluminum access panels powder coated inside and out
• Weather and vandal resistant
• Blue beacon and strobe
• Strobe turns on upon phone activation
• Recessed illuminated face plate
• Internal anchor base plate
• Ability to program up to 5 emergency numbers*
• Remote or on-site programmable**
• Panels secured with security screws
• Torx bit provided to access panels
Features:
Height
9’
Width
10-3/4”
Depth
6”
Thickness of Steel
11 Gauge
Weight
167 lbs.
Tower Specifications:
*Not applicable for 2-Way Radio application
**Not applicable for 2-Way Radio, Cellular, or
900 MHz application
Tower Site Preparation Instructions
1.
Concrete mounting pad should be at least 16” in depth and 2’ in diameter.
2.
Insert the 3/4” x 12” galvanized rods per mounting template provided.
3.
A minimum 2” of thread must be exposed above level of concrete.
4.
Let concrete set for a minimum of 48 hours to cure.
Figure 1: Front & Back View