CHAPTER
3
Installation: Overview
11
CHAPTER 3
INSTALLATION
OVERVIEW
FIGURE 1. 7 Example of the Boom Recirculation Update System
CAUTION
• Use thread sealant on all threaded joints.
• Do not over tighten threaded joints.
• Use provided hose-protectors where sharp
edges contact hoses.
• Hose lengths shown are for reference only.
Ensure hoses are routed to prevent
interference, pinching, or stretching while
folding or unfolding the booms.
Added or
Modified Parts
1
5
2
3
6
7
8
8
8
8
8
8
8
9
9
9
9
9
9
4
1. Main Tank
2. Main Pump
3. Main Flow Meter
4. Boom Pressure Transducer
5. Drain Valve
6. Electric Return Valve
7. Throttling Valve
8. Section Valves
9. Recirculation Hand Valves
Summary of Contents for Case IH 3050 Series
Page 60: ......