Manual #016-0171-081 Rev. B 07/08
CHAPTER
1
INTRODUCTION
____________________________________________________________
Congratulations on your purchase of the Raven AccuBoom system! This
system is designed to provide worry free turn on and turn off of your
booms with respect to the as-applied coverage map. The following
instructions are designed to assist you in the proper installation of the
AccuBoom system. See your Console Operation Manual for instructions
on setting up the software and using the AccuBoom system.
Important!
All boom switches must remain
in the
OFF
position while AccuBoom control
is in operation.
COMPONENTS
NEEDED
•
CAN AccuBoom Control Node: P/N 063-0172-316
•
CASE3150/3185/3200 CAN AccuBoom Cable: P/N 115-1001-011
•
6’ CAN Tee Cable: 115-0171-326
•
AccuBoom installation Manual, CASE SPX3150/3185/3200:
P/N 016-0171-081
Important:
If no CAN system currently exists
on the machine you are installing AccuBoom
on, you will need these additional
components:
Kit, CANBus, Terminators & Power Adapter
“T” – P/N 117-0159-923
1