26
OPERATION PLANNING
NOTE:
Operation planning is only available on CR12.
Operation planning is a method to define guidance lines (including tram lines) and
headland application regions for an operation on a field. A operation plan can be
selected to use for any job in a field that has an operation plan association. Also,
preconfigured guidance lines, headrows, and tramlines can be selected and applied
to numerous jobs within an existing field boundary.
Operation planning consists of two parts:
• Pre-planning allows the user to adjust field boundary and lines that are created
based on the boundary.
• Planning allows the user to create a plan for the field using the boundary modified
in pre-planning or existing guidance lines, and application zones.
To create a new operation plan:
1. Select the desired field and press Next
. The Field Management window will
open.
2. Select Operations Planning.
NOTE:
If needed, select Scouting to create a field boundary to use for
operations planning. A screen similar to the run screen will open but will
not apply product.