Initial Calibration: Create Profile Setup Wizard
9
INITIAL CALIBRATION
BOOM AND SECTION SETUP
10. In this configuration, the RCM-Sprayer ECU will not control the complete product application system. Touch
the Next Page button to skip the Tip Setup page.
FIGURE 4. Tip Setup Page
11. In the Ratio Rate mode, the RCM-Sprayer will not control sections of the boom, enter a value of 1 for the
Number of Sections field.
FIGURE 5. Section Setup Page
12. Set the Fence Row Type option to None.
13. Touch the Next Page button.
Summary of Contents for RCM
Page 10: ...CHAPTER 2 6 RCM Sprayer Ratio Rate without Boom Control Calibration and Operation Manual...
Page 20: ...CHAPTER 3 16 RCM Sprayer Ratio Rate without Boom Control Calibration and Operation Manual...
Page 28: ...CHAPTER 5 24 RCM Sprayer Ratio Rate without Boom Control Calibration and Operation Manual...