CHAPTER
2
Introduction: Preparing for Installation
5
CHAPTER 2
INTRODUCTION
Congratulations on your purchase of the RS1/HDU system! This system is designed to provide cutting-edge,
hands-free steering of the machine via Global Positioning System (GPS) coordinates.
This manual applies to the following machines:
MAKE: RBR
MODEL: Vector 300 LS/Venturi LS
FIGURE 1. RBR Vector 300 LS
PREPARING FOR INSTALLATION
Before installing the RS1/HDU system, park the machine where the ground is level, clean, and dry. Turn off the
machine and leave it turned off for the duration of the installation process. Bleed pressure from the hydraulic
system by loosening the hydraulic fittings slowly, where applicable.
During the installation process, follow good safety practices. Be sure to carefully read the instructions in this
manual as you complete the installation process.
Summary of Contents for RS1/HDU
Page 4: ...Table of Contents ii RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 8: ...CHAPTER 1 4 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 12: ...CHAPTER 2 8 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 13: ...2 Introduction Updates 9 INTRODUCTION...
Page 14: ...CHAPTER 2 10 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 26: ...CHAPTER 3 22 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 30: ...CHAPTER 4 26 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 45: ...Cab Component Installation System Diagrams 41 CAB COMPONENT INSTALLATION SYSTEM DIAGRAMS...
Page 46: ...CHAPTER 5 42 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 51: ...APPENDIX A 44 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Page 53: ...Index 46 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...