8
2.
MOUNTING THE CONTROL VALVE
(LIQUID APPLICATIONS)
1)
Mount the motorized Control Valve in the main hose line between the Flow Meter and the booms,
with motor in the upright position. (For flow less than 3 GPM [11 lit/min], the motorized Control Valve
is mounted in a by-pass line. Refer to Appendix 2 for alternate plumbing diagram).
2)
Connect the Product Cable connectors to boom valves, Flow Meter, and motorized Control Valve
(Reference Figure 1). NOTE: Black wire to boom valve #1, Brown wire to boom valve #2, Blue wire
to boom valve #3, Black/White wire to boom valve #4, Brown/White wire to boom valve #5, Blue/Wht
wire to boom valve #6, White/Black wire to boom valve #7, White/Brown wire to boom valve #8,
White/Blue wire to boom valve #9 and Pink wire to boom valve #10.
LIQUID AND
GRANULAR
APPLICA
TIONS
Summary of Contents for SCS 4600
Page 1: ...Operators Manual SCS 4600 SCS 4600 SCS 4600 SCS 4600 SCS 4600...
Page 10: ...5 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 11: ...6 SECTION 1 LIQUID AND GRANULAR APPLICATIONS LIQUID AND GRANULAR APPLICATIONS...
Page 15: ...10 FIGURE 3 BATTERY CONNECTIONS LIQUID AND GRANULAR APPLICATIONS...
Page 34: ...29 FIGURE 6...
Page 37: ...32 GRANULAR APPLICATIONS SECTION 2 GRANULAR APPLICATIONS...
Page 38: ...33 FIGURE 7...
Page 44: ...39 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 45: ...40 CAN APPLICATIONS SECTION 3 CONTROLLER AREA NETWORK CAN...
Page 47: ...42 CAN APPLICATIONS FIGURE 13 FIGURE 14...
Page 48: ...43 FIGURE 15...