29
Once the process of commissioning the boiler is
complete, the commissioning engineer MUST complete
his section in the Benchmark log book.
29
6.13
CHECKING THE HEATING THERMOSTAT
6.13.1
Allow the system to warm up and then turn
the C.H thermostat to ensure the main burner
modulates from “high” to “low” and “low” to “off”
and vice versa (scale range covers approx
45° C - 85° C).
Fig. 39
Fig. 40
6.12
CHECKING THE FLUE SYSTEM
6.12.1
The flue system should be visually checked for
soundness check all connections and fixings
are secure and tight.