Plume Management Kit TABLE 6
Maximum Length (mm) 6000
minimum length (mm) 500
Equivalent length of 45° bend (mm) 500
Equivalent length of 90° bend (mm) 1000
IMPORTANT : Max fl ue length must not exceed
6 m with a horizontal concentric
60/100 fl ue of 3 m ( L )
Fig. 12
The Maximum permitted fl ue length is
measured from the centre line of the
fl ue terminal to the top of the outlet
terminal
5.6 PLUME MANAGEMENT KIT (Fig 12)
Max 6000 mm fl ue extension duct as an
extra cost only when requested to reduce
pluming nuisance of condensation from
60/100 horizontal concentric fl ue.
IMPORTANT: Please lubricate the
internal part of the seals before
fitting.
Fig. 12a
FLUE EXHAUST DEFLECTION BEND (Fig 12a)
Flue exhaust defl ection bend are also available.
These come in both 45° and 90° degree versions.
These bends fi t directly onto the fl ue exhaust terminal
to defl ect the fl ue gas plume in an upward
or sideways direction.
Although they are not substitute for a plume kit, they
can be considered useful where condensate pluming
is causing a nuisance or can be used to eliminate
condensate collecting on the end of the horizontal
fl ue terminal.
27
Plume Management Kit Part No.
Part. No. Description
TER110101 1 metre high plume kit containing:
(Fig. 12) n. 1 terminal bend
n. 1 90° elbow bend
n. 2 45° bend
n. 1 metre 60 M-F fl ue length
n. 1 fl ue length bracket
CUR110050 45° fl ue exhaust defl ection bend
(Fig. 12a)
CUR110100 90° fl ue exhaust defl ection bend
(Fig. 12a)
L+L max 6000 mm
minimum plume kit length 500 mm
Summary of Contents for CS 80 T
Page 2: ...2 ...
Page 21: ...21 4 10 FLUE TERMINAL POSITION ...
Page 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 56 ...
Page 55: ...55 11 SPARE PARTS Fig 57 ...
Page 61: ...61 ...
Page 62: ...62 ...
Page 64: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER ...
Page 65: ...65 12 1 ANALYSER CHECK LIST ...