Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manu
I
acturers instructions and the data
¿
elds on the commissioning chec
N
list
completed in full.
7
o instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
7
o maintain the boiler guarantee it is essential that the boiler is ser
Y
iced annually
by a
*
as
6
afe registered engineer who has been trained on the boiler installed.
7
he ser
Y
ice details should be recorded on the
%
enchmar
N 6
er
Y
ice Inter
Y
al
5
ecord and left with the householder.
Summary of Contents for CS 80 T
Page 2: ...2 ...
Page 21: ...21 4 10 FLUE TERMINAL POSITION ...
Page 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 56 ...
Page 55: ...55 11 SPARE PARTS Fig 57 ...
Page 61: ...61 ...
Page 62: ...62 ...
Page 64: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER ...
Page 65: ...65 12 1 ANALYSER CHECK LIST ...