Supplied By www.heating spares.co Tel. 0161 620 6677
10
6.3
Attach the template to the wall making sure that
the centre line is vertical using adhesive tape.
- mark the holes for the side fi xing brackets to
the wall as well as the centre fl ue duct, detach
the template from the wall.
- use a 10 mm drill to make the 4 holes. Insert
the plastic expansion plugs.
- cut or core drill the 105 mm diameter hole for
inserting the fl ue duct (rear left, right or
vertical).
Fix the 4 coach bolts provided, leaving them a
couple of mm proud of the wall.
- locate the boiler fi xing stand off bracket over
the 4 bolts and tighten it to the wall, taking care
not to over twist or distort the frame if the wall
is uneven.
6.1
WHEN INSTALLING ENERGYCATCHER
IT MUST BE FITTED IN CONJUNCTION
WITH RAVENHEAT 120/150
CONDENSING BOILER THEREFORE ITS
IMPORTANT TO FAMILIARISE
YOURSELF WITH THE BOILER MANUAL
IN CONJUNCTION WITH INSTALLATION
OF ENERGYCATCHER.
6.2
Assembling backframe.
Select the left and right hand side stand off
bracket, placing them face down with the fi xing
studs facing upwards and screw holes cross
referencing, take the 8 screws fi x the top and
bottom cross members on the inner side of the
side stand off brackets.
Fig. 2
Note:
It is important to ensure screw holes line up
correct as these have been deliberately offset
to avoid incorrect positioning of cross members
within the backframe assembly.
Fig. 4.
Fix 4-15mm clips provided ( pointing clips to the
wall ) in the backframe cross members.
Fig. 5
Fig. 2
Fig. 3
Section
6 INSTALLATION
Summary of Contents for Energycatcher
Page 2: ...Supplied By www heating spares co Tel 0161 620 6677...
Page 7: ...Supplied By www heating spares co Tel 0161 620 6677 7 Section 2 GENERAL LAYOUT Fig 1...
Page 16: ...Supplied By www heating spares co Tel 0161 620 6677 16 10 5 WITH REMOTE STORAGE TANK Fig 12...
Page 17: ...Supplied By www heating spares co Tel 0161 620 6677 17 Fig 13...
Page 21: ...Supplied By www heating spares co Tel 0161 620 6677 21...