41
- To select the minimum heating temperature
To select the minimum heating temperature
press the radiator button.
press the radiator button.
- Press arrow up and arrow down buttons to
- Press arrow up and arrow down buttons to
adjust.
adjust.
- The digital display shows the current set
- The digital display shows the current set
temperature in central heating.
temperature in central heating.
- After a few seconds the digital display shows
- After a few seconds the digital display shows
the central heating temperature in demand
the central heating temperature in demand
(C.H. icon flashing, item 3 fig. 2).
(C.H. icon flashing, item 3 fig. 2).
- The fan starts and after a few seconds or
- The fan starts and after a few seconds or
so the digital led display will show that the
so the digital led display will show that the
ignition has commenced.
ignition has commenced.
- NOTES: Put the digital clock in demand
- NOTES: Put the digital clock in demand
position.
position.
- The ignition control will automatically make
- The ignition control will automatically make
three attempts to start, if it doesn’t start this
three attempts to start, if it doesn’t start this
may be due to air in the gas supply line.
may be due to air in the gas supply line.
If the burner fails to light, the digital led
If the burner fails to light, the digital led
display and fan will stop, and the display
display and fan will stop, and the display
will show the lockout code (E1 depicts flame
will show the lockout code (E1 depicts flame
failure).
failure).
- If necessary push the boiler Reset button
- If necessary push the boiler Reset button
(item 2 fig.1) and the boiler will restart
(item 2 fig.1) and the boiler will restart
automatically.
automatically.
- After the boiler has lit, allow to warm at
- After the boiler has lit, allow to warm at
minimum temperature setting to purge any
minimum temperature setting to purge any
air from the system.
air from the system.
- Once the system has been purged of air,
- Once the system has been purged of air,
set the heating temperature to the desired
set the heating temperature to the desired
setting.
setting.
6.8
CHECK THE GAS PRESSURE
6.8
CHECK THE GAS PRESSURE
Check the gas mains pressure at the gas
Check the gas mains pressure at the gas
valve inlet pressure test point (fig.35) with the
valve inlet pressure test point (fig.35) with the
boiler operating at full rate.
boiler operating at full rate.
Check with the Local Gas supplier if the
Check with the Local Gas supplier if the
pressure differs significantly from 20 mbar
pressure differs significantly from 20 mbar
G20 (natural gas), 37 mbar G31 (propane)
G20 (natural gas), 37 mbar G31 (propane)
and 29 mbar G30 (butane).
and 29 mbar G30 (butane).
With leak detection fluid test for gas tightness
With leak detection fluid test for gas tightness
of all gas components and joints.
of all gas components and joints.
IMPORTANT:
IMPORTANT:
The Gas Valve Throttle adjuster is required
The Gas Valve Throttle adjuster is required
to be sealed with tamper proof paint after
to be sealed with tamper proof paint after
adjustment (fig. 35).
adjustment (fig. 35).
6.9
6.9
COMBUSTION CHECK
COMBUSTION CHECK
Check all gas carrying components along with,
Check all gas carrying components along with,
the combustion of the appliance which should
the combustion of the appliance which should
be checked as follows.
be checked as follows.
Remove the front panel of the appliance.
Remove the front panel of the appliance.
Ensure the boiler and external controls are
Ensure the boiler and external controls are
calling for heat. Turn on the electrical supply.
calling for heat. Turn on the electrical supply.
open the hot water tap at maximum flow rate.
open the hot water tap at maximum flow rate.
Wait at least five minutes or until the unit has
Wait at least five minutes or until the unit has
reached its operating temperature.
reached its operating temperature.
Unscrew the test sample screw on the boiler
Unscrew the test sample screw on the boiler
elbow bend (item 60 fig. 10). Measure the level
elbow bend (item 60 fig. 10). Measure the level
of CO
of CO
2
2
. Check the reading against the
. Check the reading against the
corresponding value in table 10 and with
corresponding value in table 10 and with
reference to page 63.
reference to page 63.
IMPORTANT:
Do not insert the analyser
probe into the sample point immediately
or leave in long periods. This will prevent
saturation of the analyser.
During the calibration function the
combustion ratio may increase for a
short time while the boiler performance is
optimised.
The person carrying out a combustion
carrying out a combustion
measurement should have been assessed
measurement should have been assessed
as competent in the use of a flue gas
analyser.
The flue gas analyser used should be one
meeting the requirements of BS7927 or BS-
EN50379-3 and be calibrated in accordance
with the analyser manufacturer’s
requirements.
Fig. 37
ELECTRODES POSITION
CO2
%
NAT
GAS
9.0
(+0.5
/
‐
0.5)
LPG
10.5
(+0.5
/
‐
0.5)
It is essential that this test is repeated
It is essential that this test is repeated
with the casing on as this will check the
with the casing on as this will check the
integrity of the flue.
integrity of the flue.
If adjustment proves necessary then
proceed as follows.
IMPORTANT:
Any adjustment to the gas
valve should only be carried out by a
qualified person.
Referring to the table 10, adjust the
maximum level of CO
2
with the Throttle
using a 4 mm hex on the gas valve (fig.35).
Anti-clockwise to decrease CO
2
.
Clockwise to increase CO
2
After any new regulation wait to stabilise
for about one minute. Replace the front
cover.
TABLE 10
Summary of Contents for White Boiler WH 80
Page 2: ...2 ...
Page 21: ...21 4 10 FLUE TERMINAL POSITION ...
Page 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 61 ...
Page 55: ...55 11 SPARE PARTS Fig 62 ...
Page 59: ......
Page 62: ...61 ...
Page 63: ...62 ...
Page 65: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER ...
Page 66: ...65 12 1 ANALYSER CHECK LIST ...