SEE FIG. 7
1.
Check that the hearth is level, then remove the
appliance from its transit wooden pallet.
2.
Lift up the insulating covers and remove the hotplate
using lifting hooks provided.
SEE FIG. 8
5.
Remove the insulation pad (B).
6.
Remove the 4 flue cleaning access door securing bolts
and remove door.
7.
Check the position of the boiler flueway baffles.
8.
Replace door and refit bolts.
9.
Replace insulation pad (B) and the hotplate ensuring
that it seals around the edges.
NOTE: FOR THIS APPLIANCE USE ONLY 6 FLUEWAY
BAFFLES.
Installation Instructions
13
SITE LOCATION
FIG. 7
FIG.8
DESN 510523
DESN 510524