Description

Gardian™ W51 120 V pre-assembled self-regulating heating cables are
designed for residential and commercial metal and plastic pipe freeze
protection and roof & gutter de-icing applications. Gardian W51 heating
cables are available in 6, 12, 24, 50, 75 and 100 foot lengths, and each
comes assembled with a 30-inch power cord and plug.

Kit contents 

1 Gardian W51 pre-assembled electric heating cable
2 Roof and gutter labels
2 Pipe labels

Additional items required but not supplied for pipe applications

Waterproof thermal insulation (e.g. preformed foam)
Ground-fault protected outlet (GFCI)
Raychem

®

H903 Application Tape and Electric Traced Labels

Additional items required but not supplied for roof & gutter applications

Raychem H913/H914 Roof Clips (10 clips for each 7 linear feet of
roof edge)
Raychem H915 Hanger Bracket (1 for each downspout, 2 if looping)
UV Resistant cable ties
Ground-fault protected outlet (GFCI)

Approvals

718K Pipe Heating Cables
60J9 Residential and Mobile Home Pipe Heating Cables
877Z De-Icing and Snow Melting Equipment

Desig. 3A, 3B, 3C, 2E, 3D

Fire and shock hazard.

This product is an

electrical device that must be installed
correctly to ensure proper operation and to
prevent shock or fire. Read these important
warnings and carefully follow all the
installation instructions.

• To minimize the danger of fire from sustained

electrical arcing if the heating cable is damaged
or improperly installed, and to comply with the 
requirements of Tyco Thermal Controls

and national electrical codes, ground-fault 
equipment protection must be used on each 
heating cable branch circuit. Arcing may not be 
stopped by conventional circuit protection.

• For pipe freeze protection applications, use

only fire-resistant insulation materials such as
preformed foam or fiberglass.

• Do not damage the heating cable and power

cord or plug. Remove any damaged cables
from service immediately.

• Do not use any wire or metal clamps to attach

the cable to the pipe. Use tape (1/2 inch wide
to 1 inch wide) or plastic cable ties.

• Do not install the heating cable underneath any

roof covering for roof and gutter de-icing.

• Leave these installation instructions with the

user for future reference.

Installation Instructions

Gardian

W51

120 V pre-assembled electric heating cables for
pipe freeze protection and roof & gutter de-icing

®

WARNING:

Pipe freeze protection

Roof and gutter de-icing: standard roof

Roof and gutter de-icing: standing seam metal roof

Summary of Contents for Gardian W51

Page 1: ...al device that must be installed correctly to ensure proper operation and to prevent shock or fire Read these important warnings and carefully follow all the installation instructions To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed and to comply with the requirements of Tyco Thermal Controls and national electrical codes groun...

Page 2: ...onsult Tyco Thermal Controls at 800 545 6258 General requirements for pipe freeze protection Gardian heating cables may be used on metal and plastic water pipes but not on flexible vinyl tubing such as garden hoses Gardian heating cables are not intended for use inside any pipes for freeze protection of liquids other than water or for use in classified hazardous locations Install with a minimum of...

Page 3: ...cing Figure 1 or spiraling Figure 2 For straight tracing install the heating cable on a lower half of the pipe for example in the 4 o clock or 8 o clock position Be sure to install the additional heating cable required for valves flanges etc as shown in Figures 1 and 2 When the design calls for spiraling begin by suspending a loop every 10 feet as shown in Figure 2 To determine the loop length div...

Page 4: ...cluding valves joints and wall penetrations has been fully insulated as shown in Figure 3 For protection to 20 F 29 C use 1 thick insulation Install the insulation on the piping as soon as possible to minimize the potential for mechanical damage after installation Be sure the Gardian W51 label is visible on the outside of the thermal insulation 5 Finishing the installation To prevent damage to the...

Page 5: ...movement For the names of manufacturers of snow guards or snow fences contact Tyco Thermal Controls at 800 545 6258 Gardian heating cables may be used on Roofs made from all types of standard roofing materials including shake shingle rubber tar wood metal and plastic Gutters made from standard materials including metal and plastic Downspouts made from standard materials including metal and plastic...

Page 6: ... in roof edge None 18 18 2 5 12 18 24 2 8 24 18 36 3 6 36 18 48 4 3 None 24 18 2 0 12 24 24 2 4 24 24 36 2 9 36 24 48 3 6 Gutter required No additional heating cable is required for gutters when tracing standing seam metal roofs Table 3 Typical spacing and layout measurements Length of cable per foot of roof edge feet Standing seam metal roof Eave overhang in Standard roof 18 seam 24 seam None 2 2...

Page 7: ...tachment of the cable to the gutter bottom is not necessary Loop the heating cable in downspouts Do not leave the end of the Gardian in air at the end of the downspout as shown in Figure 11 Use H915 Hanger Brackets at the gutter downspout transition to protect the heating cable from fraying and from damage from sharp edges and to provide strain relief as shown in Figure 12 Refer to the H915 kit in...

Page 8: ...ns of Sale for this product and in no case will Tyco Thermal Controls or its distributors be liable for any incidental indirect or consequential damages arising from the sale resale use or misuse of the product Specifications are subject to change without notice In addition Tyco Thermal Controls reserves the right to make changes without notification to Buyer to processing or materials that do not...