Implementation — connection to distribution panel
• Alternatively, the supplied power cable may be connected to a suitable breaker or switch on the
vessel's distribution panel or factory-fitted power distribution point.
• The distribution point should be fed from the vessel’s primary power source by 8 AWG (8.36 mm
2
)
cable.
• Ideally, all equipment should be wired to individual suitably-rated thermal breakers or fuses, with
appropriate circuit protection. Where this is not possible and more than 1 item of equipment shares
a breaker, use individual in-line fuses for each power circuit to provide the necessary protection.
1
Positive (+) bar
2
Negative (-) bar
3
Circuit breaker
4
Fuse
• In all cases, observe the recommended breaker / fuse ratings provided in the product’s
documentation.