2.3 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system
2
Obtain all required equipment and tools
3
Site all equipment
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on test the system.
2.4 Installation schematics
Use the supplied schematic templates to record the details of the
installation.
This document includes a number of schematic templates to assist
you in planning Nav Stations, cables and connections. It is important
to record this information for the purposes of the initial installation
and for the future configuration and maintenance of the system.
The schematic templates can be used to record the following
information:
• Nav Station name.
• Nav Station location.
• Nav Station IP address.
• Equipment serial numbers.
• Equipment location.
• GPM processor Data Master designation.
Planning the installation
17
Summary of Contents for G-Series system
Page 1: ...G Series system Installation instructions...
Page 2: ......
Page 4: ......
Page 8: ...8 G Series installation instructions...
Page 14: ...14 G Series installation instructions...
Page 98: ...98 G Series installation instructions...
Page 124: ...124 G Series installation instructions...
Page 142: ...142 G Series installation instructions...
Page 146: ...146 G Series installation instructions...
Page 158: ...158 G Series installation instructions...
Page 180: ...www raymarine com...