Chapter 5: System checks
Chapter contents
•
5.1 Commissioning pre-requisites on page 36
•
5.2 Commissioning process on page 36
•
5.3 Initial power on test on page 37
•
5.4 Using the set up wizard on page 39
•
5.5 Dockside calibration on page 40
•
5.6 Dealer settings on page 42
•
5.7 Seatrial calibration on page 42
•
5.8 Checking autopilot operation on page 45
System checks
35
Summary of Contents for P70
Page 2: ......
Page 4: ......
Page 20: ...20 p70 p70r Pilot controller Installation instructions...
Page 28: ...28 p70 p70r Pilot controller Installation instructions...
Page 68: ...68 p70 p70r Pilot controller Installation instructions...
Page 77: ...Owner notes...
Page 78: ...Owner notes...
Page 79: ......
Page 80: ...www raymarine com...