Chapter 8: Commissioning - SPX and SmartPilot systems
Chapter contents
8.1 SPX and SmartPilot autopilot installation on page 50
8.3 Initial setup and commissioning on page 51
8.4 Powering the Pilot controller on on page 51
8.5 Using the Set-up Wizard on page 52
8.6 Dockside calibration on page 53
8.7 Dealer settings on page 54
8.8 Adjusting the hard-over time — SmartPilot and SPX on page 55
8.9 Sea trial calibration on page 55
8.10 Checking autopilot operation on page 57
Commissioning - SPX and SmartPilot systems
49
Summary of Contents for P70
Page 2: ......
Page 4: ......
Page 10: ...10 p70 p70R ...
Page 14: ...14 p70 p70R ...
Page 28: ...28 p70 p70R ...
Page 29: ...Chapter 5 Installation Chapter contents 5 1 Mounting on page 30 Installation 29 ...
Page 38: ...38 p70 p70R ...
Page 48: ...48 p70 p70R ...
Page 58: ...58 p70 p70R ...
Page 68: ...68 p70 p70R ...
Page 74: ...74 p70 p70R ...
Page 80: ...80 p70 p70R ...
Page 94: ...94 p70 p70R ...
Page 110: ...110 p70 p70R ...
Page 118: ...118 p70 p70R ...
Page 121: ......