PILOTSTAR D
4--2
3060.DOC012
Edition: March 13, 2009
4.3
Installation Planning and Instruction
4.3.1
Operator Unit (Dimensional Drawing 102D864.HP005)
Requirements to be met by the mounting site:
The device has to be readily visible and be placed such as to ensure convenient
handling.
For the flush mounting, refer to the Dimensional Drawing 102D864.HP005 (recess and
drilling scheme).
NOTE
Prior ti starting work, ensure that below the selected
point of recess there is sufficient space for the sawing
work required.
4.3.2
Connection Unit (Dimensional Drawing 102E863.HP005)
Requirements to be met by the mounting site:
The connection unit should be located within a radius of approx. 2m with regard to the
operator unit. The clearance above the connection unit specified in the dimensional
drawing must absolutely be ensured.
4.3.3
Feedback Unit (Dimensional Drawing 101C529 HP005)
Requirements to be met by the mounting site:
1. In case linkage transmission is selected, it is to be ensured that this cannot be
blocked by loose objects!
All cables lying within this area must be fixed.
2. If toothed--belt transmission is selected, this must be correctly pre--stressed as
indicated in the dimensional drawing.
All cables lying in the vicinity must be fixed.
Summary of Contents for AP02-S01
Page 8: ...HSC P i l o t s t a r D VI 3060 DOC012 Edition March 13 2009 Intentionally left blank ...
Page 42: ...PILOTSTAR D 1 26 Edition March 13 2009 3060 DOC012 Intentionally left blank ...
Page 92: ...PILOTSTAR D 2 50 Edition March 13 2009 3060 DOC012 Intentionally left blank ...
Page 144: ...PILOTSTAR D 4 40 3060 DOC012 Edition March 13 2009 Intentionally left blank ...
Page 146: ...PILOTSTAR D Edition March 13 2009 3060 DOC012 Annex Content Intentionally left blank ...
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......