Operator Unit 130-626.NG002
Standard 22 GYRO COMPASS
3-2
WARNING
Observe precautions for handling electrostatic sensitive devices
(ESD).
3.2
Installation
The installation of an operator unit is performed according to appended Dimensional
Drawing No. 130-626.HP005 and appended Connection Diagram 130-626.HP008.
Adjustment of DIP-Switches must be performed according to appended Configuration
Sheet 130-626.HP010 (NG002) or 130-626.HP011 (NG002 E01).
The operator unit must be configured before setting into operation.
This configuration can be performed with the Configuration Tool AS only.
Voltage supply and connections as well as the bus terminations must be performed
according to the following sections.
For connecting the cables see also respective system wiring diagrams (part of delivery for
a complete CAN-Bus system).
Do not forget to connect the earthing flat plug at the back side of the
housing.
Remove the protection foil from the display after installation.
3.3
Connection
WARNING
By applying the supply voltage (24 V DC), the operator unit is set into
operation.
There is no separate power switch.