Rack Mounting Instructions 60
1.
Installing and Removing Tool-less Rails (Square Hole or Round Hole Racks)
Position the left and right rail end pieces labeled FRONT facing inward and orient each end
piece to seat in the holes on the front side of the vertical rack flanges (1). Align each end
piece in the bottom and top holes of the desired U spaces (2). Engage the back end of the
rail until it fully seats on the vertical rack flange, and the latch clicks into place. Repeat
these steps to position and seat the front end piece on the vertical rack flange (3). To
remove the rails, pull the latch release button on the end piece midpoint and unseat each
rail (4).
Figure 53. Installing and Removing Tool-Less Rails
Summary of Contents for A8
Page 1: ...rcgs20200916 2020 2020 2020 2020 2020 2020 2020 2020 2020 ...
Page 27: ...V12 Overview 26 Figure 21 Service Information with System Touch Points ...
Page 75: ...RAID Storage 74 Select Virtual Disk Management Figure 63 PERC Adapter Server Profile View ...
Page 81: ...RAID Storage 80 Select Create Virtual Disk Figure 69 Create Virtual Disk ...
Page 82: ...RAID Storage 81 Select RAID level Figure 70 Select RAID Type ...
Page 83: ...RAID Storage 82 Select Physical Disks Figure 71 Select Physical Disks ...
Page 85: ...RAID Storage 84 Scroll up and Click Apply Changes Figure 73 Apply Changes ...
Page 86: ...RAID Storage 85 Select OK Figure 74 Confirm Completion ...
Page 89: ...RAID Storage 88 Confirm and Click Yes Figure 77 Confirm Operation ...
Page 96: ...RAID Storage 95 Verify all settings and if correct click Finish Figure 84 Complete the Wizard ...