Finned copper tube gas boilers & water heaters – Boiler Manual
44
STarT UP FOrM
Date of Start Up:
Job Name:
Model #:
Serial Number #:
Boiler Model:
Dominator
LCD
Company Name
Fuel Type:
Natural Gas
Propane
Tech Name
System Type:
Hydronic
Domestic
Phone Number
PrE-STarT UP CHECK LIST
ANY VISUAL DAMAGE TO UNIT?
INLET FILTER INSTALLED AND CLEAN?
PIPING PROPERLY CONNECTED?
ALL WIRING CONNECTED PROPERLY?
SYSTEM FLOODED AND FLOWING?
BOILER PUMP PUMPING INTO INLET?
BOILER CIRCULATOR WIRED?
COMBUSTION AIR PROVIDED?
VENT/STACK CONNECTED?
PROPER SERVICE CLEARANCE PROVIDED?
IS VENT VERTICAL THROUGH THE ROOF?
OUTDOOR AIR SENSOR INSTALLED/WIRED?
IS VENT THROUGH THE WALL?
ARE UNITS RACKED?
IS POWER VENT INSTALLED AND WIRED?
IS RACK ASSEMBLED TIGHTLY?
SEALED COMBUSTION?
NO HOLES SCREWED INTO CABINET?
ELECTrICaL/WIrING/CONTrOL
Boiler Supply Voltage
External BMS System
Boiler Pump Supply Voltage
Utilize Boiler BTC For Control
Voltage Down Stream of Transformer
BTC CONTrOL SET UP: (Not all settings are used for every mode. (Dominator Series Only))
: Mode
: Boiler Max
: Purge
D
T
: Boiler Target
: Boiler Min
: Tank Target
: Boiler Diff
LCD ONLY
: Tank Diff
: Intr-Stg Diff
: Operator (STG1)
: Outdoor Start
: Intr-Stg On Dly
: High Operator (STG 2)
: Boiler Start
: Intr-Stg Off Dly
: High Limit
: Pump Purge