RBR#0008819revA
–
10
To reassemble, line up the battery end alignment pin with its socket and push until the battery end cap is mated fully to
the housing.
Remember to keep the O-rings clean and avoid scratching the O-ring mating surfaces. Carefully inspect the
O-rings, as described in the Inspecting the
, before deploying the logger.
Reinstall the 2 X M6 screws and tighten to max of 10Nm.
Summary of Contents for quartz3 BPR zero
Page 1: ...rbr global com INSTRUMENT GUIDE BPR zero...
Page 4: ...RBR 0008819revA 4 3 Revision history Revision No Release Date Notes A 04 May 2020 Original...
Page 17: ...RBR 0008819revA 17 7 Appendix 7 1 Appendix A RBRquartzBPR zero Product Drawing...
Page 18: ...RBR 0008819revA 18...
Page 19: ...RBR 0008819revA 19 7 2 Appendix B RBRquartzBPR zero Service Drawing...
Page 20: ...RBR 0008819revA 20 7 3 Appendix C RBRquartzBPR zero Connector Details...