16
DEVICE ID
ZONE NAME
PANEL/
CIRCUIT # PWR/ENGY
DIM
NOTES
Installation Lightcloud Gateway
Installing Lightcloud Gateway
(Continued)
Turn on the Gateway main
power switch. Replace out-
er cover and use included
screws to secure.
When all Devices are in-
stalled and powered, you’re
ready to call RC to activate
and verify your system,
and complete your site’s
configuration.
Confirm that the cellular
signal strength LED is
yellow or green. If the
Gateway is powered but
this LED is not lit, relocate
the Gateway to an area
with better reception.
You can use the included power
cable to easily test the signal
strength in a few locations, but
remember that the Gateway
must be hardwired for perma-
nent installation.
7
9
8
Place extra Device ID stickers on your
Lightcloud Device Table (see page 18)
for future reference.
For each Device, find the number from the panel
board and write it down on the Device Table.
STEP SEVEN
STEP NINE
STEP EIGHT
GATEWAY DEVICE IDs
1
2
3
NOTE
: Use only RC-
authorized parts.
Summary of Contents for Lightcloud
Page 1: ...Manual Manuel ...
Page 4: ...4 ...
Page 20: ......
Page 21: ......
Page 24: ...24 ...
Page 40: ...Tedt 40 73600 RCL ...