 Real Fires Through wall Gas Fireplace Installation Instructions 

 
                                               Minimal Range             
 
 
Real Fires Through wall Model is designed for installation into Timber framed 
cavities. It is not suitable for existing masonry situations. 
 
Ventilation 

Ventilation to the room that houses the fire must meet the requirements of NZS 5261 
 

Framing Details 

Prior to installation, timber framing needs to be provided to suit the Through Wall 
Fire. 

See installation drawing 

 

Position of Fire 

The Through wall fire has glass on one side, the other side is open. It must be 
confirmed which way the fire is to be installed. The fire can not be reversed after 
installation. The open side has the higher heat output. 
 

Hearth  

The minimum hearth size is 300mm into the room and 150mm wider each side than 
the fire. ( 300mm x 1200mm) 

 
Hearth – Open side  

A non combustible hearth must be provided in front of the open side of the Through 
wall fire unless the floor is non combustible.  

 
Hearth – Glass side  

A non combustible hearth must be provided in front of the glass side of the Through 
wall fire unless the floor is non combustible or the fire is raised a minimum of 300mm 
above floor level.  

 
Height of fire from floor 

It is important to confirm the height the fire is to be installed above the floor level. 
This is usually the hearth height. For example if the hearth is 100mm high then the 
fire needs to be 100mm high. (

note-

 some elevated installations specify the fire higher 

than the hearth).  Once the height is confirmed a platform needs to be built to support 
the firebox. The platform can be of timber construction. It needs to be sturdy and 
level.

 

 

 

Gas Supply 

A suitable gas supply needs to be provided at the right hand side of the timber frame 
cavity. This is as looking at the cavity from the side which will be the open side of the 
fire. 

See installation drawing

  

The pipe sizing should be calculated to supply gas to suit the megajoule rating of the 
fire. See rating chart. The gas supply should be reduced down to 10mm copper pipe at 
the fireplace location and left with a coil of approx 1 metre to feed into the firebox. 