Left Front Roof
Right
Front
Roof
Top Floor
Pro Tip: Do a second check for centering the
Top Floor by holding the Front Roofs upside-
down against the bottom of the Top Floor.
Each Roof should reach all the way from the
Tower Side to the end of the Floor.
15. Glue and tape the Top Floor to the housebody, fl ush at
the back and spaced evenly along the sides. The Top Floor must
overhang the housebody evenly (
11
/
16
”) on each side.
Review:
all parts are in place and all joints are tight.
• Check the position of the stair hole - on the right when looking
at the house from the front.
• The house is straight - the Sides are straight up-and-down in
back
• The Top Floor overhangs the sides by
11
/
16
”
• The Top Floor lines up with the Side inside the stair hole
• The Top Floor lines up with the Sides in back
Instructions for the Special Edition #SE-JM907 The Alison, Jr.
C: Foundation Page 11
Illustration #14
Foundation lines up with the
rear edge of the Base Floor
Attach the Foundation:
Wiring? The easiest time to prepare for wiring into the
Foundation space for an E247 Jack is now (
www.realgoodtoys.help
).
16 - 17. If your Foundation hasn’t been assembled yet, go back to
page 6 and do it now.
Pro Tip: Our Assembly Pro paints the foundation before attaching it to
the house.
18. Glue, tape, and weight the housebody to the foundation set,
lined up at the back edge and spaced evenly side-to-side. Make sure the
Foundation is spaced evenly from back-to-front along each side.
Add weights all around; let the glue dry
Centered side-to-side, lined up with the fl oor
Centered side-to-side along the Side walls
19. Glue, tape, and weight the Porch base Floor
(
1
/4” thick) to the housebody and Foundation
Let the glue dry