Instructions for the Special Edition #SE-JM907 The Alison, Jr.
B: Housebody
Page 9
8. Lay the housebody down on its BACK.
Without glue test the Right Front in place on the
house, fl ush with the Right Side at the top, bottom,
and right edge. Remove the fl oor’s tape that gets in
the way.
9. Spread glue in the grooves of the Right Front
panel and on the front edge of the Right Side panel.
Set the Right Front into position on the housebody
(Illustration #5).
Carefully tape in many places along the bottom
edge, making sure the Base Floor is tight to the top
edge of the groove.
Exactly line up the edge of the Front with the face
of the Side, all the way from the bottom to the top
(this is the operation that straightens the house).
Tape the Front securely to the Right Side to hold
everything tight as the glue dries
(Illustration #6).
Review:
Make sure all parts are in place and all the
joints are tight.
•
Check the position of the stair hole, closer to the
front edge.
•
The Base Floor is tight to the groove-top.
•
The house is exactly lined up on the right edge.
Preview:
In this section, you will attach the Tower
Sides, Tower Floors, Fillstrips, and Left Front.
10. Glue a Tower Side to the Right Front panel
touching the front edge of the fl oors (Illustration #7).
Glue a Fillstrip to the back edge of the Tower Side
between each fl oor.
Tape the Tower Side and Fillstrip to the Right Front.
Illustration #5
Right Front
Panel
Base Floor
Side Panel
Tower Side
Right Front
Fillstrip
Left Front
Illustration #7
Tower Side
Fillstrip
Steps 10 and 12
view from the top
Flush
Flush
Illustration #6