User Manual
16
that this current is less than the maximum discharge current of the product used in Table 7.
Ground Check
Check and confirm the location of the working ground wire of the power system in the equipment room.
4.1.4.Battery Inspection and Acceptance
On the installation site, check the battery packaging to make sure it's intact;
Check battery box according to the packing list, make sure all the material is complete, if any damaged,
please fill in the receipt;
Please be careful while handling batteries, avoid any damage.
4.2.Installation
4.2.1.Cautions
When begin to install the battery system, you should pay attention to the following matters:
Installation space and load bearing. Make sure that there are sufficient fixed components to install the
battery system, and to ensure that the battery mounting bracket or the cabinet be strong enough to
bear the weight.
Cable specifications. To ensure that the use of the connection of the power supply line can meet the
maximum current requirements of equipment operation.
Project layout. Ensure the whole construction process of power equipment, batteries and other
reasonable layout.
Wiring layout. Ensure that the wiring reasonable, orderly; and consider the moisture-proof, corrosion
prevention.
The whole installation process should wear anti-static wristband.
The installation site should be at least two or more peoples to operate.
CAUTIONS
:
Please ensure the installation site safe before installation.