CLEANING INSTRUCTIONS

REC solar panels have been designed for easy maintenance. However cleaning solar panels can assist in optimizing electricity output. The need for 

cleaning will vary dependent on location, rainfall, pollution levels and the angle of installation – the lower the angle of installation, the more cleaning 

will be required. ‘Normal’ rainfall will naturally clean the panels if installed at a sufficient angle to ensure water runs off the surface. To optimize 

electrical output it is recommended to clean the panels when dirt can clearly be seen on the glass surface.

Using a soft rubber squeegee, wipe the panel surface from the top downwards to remove any residual water from the panel glass. Take care not to 

scratch the surface or introduce foreign elements that may cause damage to the panel. Always rinse the panel with plenty of water. Panels can be 

left to dry in the air or wiped dry with a clean and soft cloth or chamois. 
For more information on cleaning REC solar panels, consult the 

REC Cleaning Information Sheet which is available to download from the online REC 

Download Center www.recgroup.com/downloads. If in doubt at any time when cleaning the panels, stop and obtain professional advice.

SYSTEM INSPECTION

The system should be inspected regularly to ensure that: 

•  Fasteners are secure, tight and free from corrosion,
•  Electrical connections are secure, tight, clean and free of corrosion,
•  The mechanical integrity of the cables is intact,
•  Bonding points to ground are tight, secure and free from corrosion (which could break the continuity between the panels and ground).

RECYCLING 

REC makes every effort to ensure panel packaging is kept to a minimum. The paper and cardboard packaging can be recycled and the protective 

wrapping and panel separating blocks are also recyclable in many areas. Recycle packaging and panels according to local guidelines and regulations.

DISPOSAL OF OLD ELECTRICAL AND ELECTRONIC EQUIPMENT

Panels should be recycled at the end of their useful life according to local guidelines and regulations. By ensuring REC solar panels are disposed 

of correctly, you will help prevent potential negative impact on the environment and human health. The majority of the panel components can be 

recycled.
For installations in the European Union, REC solar panels are subject to WEEE regulations. The symbol in fig. 10 as found on the label on the rear 

of the panel indicates that this product must not be treated as household waste and must be disposed of at an appropriate collection point for the 

recycling of electrical and electronic equipment. The recycling of the different components and materials will help to conserve natural resources.

Fig. 10: WEEE symbol

The European WEEE (Waste Electrical and Electronic Equipment) Directive regulates the correct recycling of electronic and electrical waste in all 

member states of the European Union (EU). For end-customers it is a free of charge disposal system, financed by the manufacturers and importers, 

where panels can be brought to a local recycling depot, or in the case of larger numbers, be picked up from site, as is the case with other electrical 

equipment, e.g., refrigerators or televisions. The extensive process steps for proper disposal are strictly regulated and place no further obligations 

on the owner of the panels. For more information about the recycling of this product, please contact your local recycling authority or recycling 

center.

CAUTION

•  Panel cleaning must always be carried out when the panels are cool, e.g., early morning, to avoid breakage through thermal shock.
•  Use of high pressure hoses or cleaners is not permitted as these may damage the panels, laminate or cells.

NOTE

•  Avoid putting pressure on the on the panel surface when cleaning or drying, e.g., leaning, standing or resting buckets on it.
•  Use only deionized water free from grit and physical contaminants, at ambient temperature and use a sponge, microfiber cloth or a soft 

brush to wipe away the dirt (rainwater, tap water or diluted alcohol may also be used as a secondary solution). 

•  For further cleaning a mild, biological and biodegradable washing-up liquid may be used.
•  If stains require more effort to be removed, Isopropyl alcohol of a concentration less than 10% may be used. Acidic or alkaline detergent may 

not be used.

i

Summary of Contents for Alpha 72 Series

Page 1: ...rec Alph 72 SERIES INSTALLATION MANUAL FOR ALL REC ALPHA 72 SOLAR PANELS CERTIFIED ACCORDINGTO IEC 61215 IEC 61730 STANDARDS...

Page 2: ...AGEMENT 11 PANEL MAINTENANCE 12 RECYCLING 12 DISPOSAL OF OLD ELECTRICAL AND ELECTRONIC EQUIPMENT 12 PANEL CHARACTERISTICS 13 Technical Properties REC Alpha 72 Series 13 ANNEX 1 INSTALLATIONS ON WATER...

Page 3: ...ore installers are responsible for the following Only qualified personnel must perform work on photovoltaic systems such as installation commissioning maintenance and repairs Be sure to follow the saf...

Page 4: ...erved during handling to avoid the risk of sparking fire hazards burns and lethal electric shocks Exercise extreme caution when wiring panels and look out for damaged or dirty cables etc Never insert...

Page 5: ...voiddamageordegradationtothepackagingorpanelcomponents pallets and panels must be stored in a controlled environment ideally internal where it is protected from the elements e g rain dust and direct s...

Page 6: ...bundled together so loops are as small as possible String configurations must be checked before commissioning If open circuit voltage Voc and short circuit current Isc deviate from specification this...

Page 7: ...mp grip length and the central point of the fixation e g the bolt is fully within the required clamping zone as indicated on the following pages CLAMP SPECIFICATIONS Clamp installation must be carried...

Page 8: ...g 3 Clamping zones for panels with rails parallel to short side CAUTION The minimum grip length of each clamp and its center point must be fully located in the same color zone to be rated to that load...

Page 9: ...eledgeofeachpanelmustbesupportedbytworails figs 2a 2b ofaluminiumorgalvanized steelsuitablefortheapplicationandappropriateforthelocalenvironment Observethefollowingprocedureswhenusingmountingholes The...

Page 10: ...hown in fig 9 and can be further identified by the grounding symbol stamped in the frame next to it Check all applicable requirements before beginning installation Suitable grounding clips lugs or oth...

Page 11: ...standards e g IEC 62852 or UL 6703 to ensure they are fit for purpose and safety Useofanychemicalsorlubricantsontheconnectorsorcontactsmayonlybecarriedoutinlinewiththeconnectormanufacturer sinstructio...

Page 12: ...local guidelines and regulations By ensuring REC solar panels are disposed of correctly you will help prevent potential negative impact on the environment and human health The majority of the panel c...

Page 13: ...ewithIEC62790 Connectors St ubliMC4Evo2 PV KBT4 EVO 2 PV KST4 EVO 2 4mm inaccordancewithIEC62852 IP68onlywhenconnected Cable 4 mm solar cable 1 2 m 1 3 m in accordance with EN 50618 Dimensions 2063 x...

Page 14: ...installation must have sufficient length and slack to prevent damage due to water level changes and wave motions ii Mounting panels Installation of REC solar panels must be in accordance with the afor...

Page 15: ...r instructions to ensure optimum mounting of MLPE device and prevent any slippage during operation MLPE devices may also be attached to the mounting construction In such cases refer to the instruction...

Page 16: ...nformity of the product with the requirements of the above mentioned EC Directive and its conformity with the safety requirements of the EC Low Voltage Directive 2014 35 EU DIN EN 61215 VDE 0126 31 20...

Page 17: ...RECInstallationManual RECAlpha72Series IEC61215 61730 Rev A 02 20 Ref NE 06 23 17 DOCUMENTHISTORY Date Revision Reason 02 2020 A First release...

Page 18: ...RECSOLARPTE LTD 20TUASSOUTHAVENUE14 SINGAPORE637312 SINGAPORE Tel 6564959228 Mail post recgroup com www recgroup com 18 RECInstallationManual RECAlpha72Series IEC61215 61730 Rev A 02 20 Ref NE 06 23...

Reviews: