11
3. Stand & Wheel Kit Assembly
- cont.
3.3 Wheel Kit Assembly
1. On the underside of the operating frame, find
the two flattened areas on either side. Mount
the two fixed wheels and secure in place using
the nuts and bolts provided
Fig.3.7
.
2. Take the two castor wheels and mount and
secure them to the operating frame pedal
Fig.3.8
.
3. Feed one of the axles through the hole on the
brace support bar and secure it using one of the
pins provided
Fig.3.9A
and
3.9B
.
4. Feed the axle through the fixing holes on both
of the legs and operating frame pedal
Fig.3.10
.
5. Repeat this process at the opposite side
ensuring that both sides of the axle have been
secured with the fixing pins and that both sides
of the operating frame pedal are fixed. It should
now be secure between the legs.
6. With the operating frame in hand, locate the
release catch and fix it to the operating frame
Fig.3.11
.
7. Return to the stand and partially fitted wheel
kit ready to fit the operating frame to the stand.
8. Feed the second axle through the holes in the
brace support bars and legs at the other side
of the stand and secure it using the fixing pins
Fig.3.12
.
9. At this point it is important to ensure that
the operating frame sits below the operating
frame pedal and that the release catch hooks
under the operating frame pedal
Fig.3.13
. It is
possible to adjust the operating frame to enable
the release catch to hook onto the operating
frame pedal.
Wheel Kit Operation
To operate the wheel kit press down on the
operating frame pedal
Fig.3.14
. This motion
raises the planer thicknesser and stand. The
release catch hooks onto the operating frame
pedal allowing the planer thicknesser to be
wheeled freely around the workshop.
To set the planer thicknesser in position, press
down on the release catch. This motion releases
the wheels and lowers the planer thicknesser
onto the legstand.
Fig.3.8
Fig.3.9A
Fig.3.12
Fig.3.7
Flattened areas
Fig.3.9B
Fixing pin
Fig.3.14
Axle
Brace support bar
Fig.3.10
Axle
FIXING PIN
Operating frame pedal
Fig.3.11
Release catch
Fig.3.13
Operating frame pedal
Release pedal
Operating frame
Fig.3.15
Summary of Contents for PT260
Page 28: ...28 11 Parts Diagrams Stand Wheel Kit ...
Page 29: ...29 11 Parts Diagrams cont ...
Page 30: ...30 11 Parts Diagrams cont ...
Page 34: ...34 ...
Page 35: ...35 ...