Z
32
4 - TROLLEY KIT ASSEMBLY
GB
Position the additional mini board “Z” in the top right, near the boiler electronic board and make the electrical connections.
After having made all the electrical connections, hook the trolley to the structure with the two lever closures. Reassemble the sides.
Attention!! Make sure the trolley keeps the micro pressed.