13
ENG
6.6 Sump Screen:
Position the sump screen above the front wall of the rear sump. Align the
hinges above the clips on the top of the side walls and push firmly into
position. Push the rear of the sump screen until it clicks into position.
To rotate, pull the top of the screen forward until the screen lays flat on
the top of the tank.
7 Automatic Top-Off (ATO):
The MAX
®
NANO ATO unit is supplied fully assembled and should not need
any adjustment before installing on the system however make sure that
the float valve is at the correct angle as shown in the diagram. Hold the
circulation and skimmer pump cables to the side of the Pump Switch
Box and slide the ATO into position on the rear wall of the sump. Make
sure that the cable of the circulation pump is located in the recess at the
bottom of the reservoir.
NOTE
: Do not add RO water to the ATO until you have the correct
amount of seawater in the system.
Home
Installation and Operation Manual