16
C
DD
B
A
ASSEMBLY
ASSEMBLY
ASSEMBLY
ASSEMBLY INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS
1
1
1
13
3
3
3....
Install the hood handle (A) and
hood handle bases (B) to the hood
(C) using
M6 x 20 bolts (DD)
1
1
1
14
4
4
4....
Unscrew the pre-assembled nut 9
from the thermometer (D). Attach the
thermometer (D) to the hood (C),
re-attach nut 9 and tighten
13
13
13
13
14
14
14
14
D
C
M9 Nut