5
Install the nozzle cap to the hose.
Slide clamp (#6J) onto hose. Place
the hose shank (8400-500-NYB)
into cap (25608-1-NYR) then slip
gasket on top of the hose shank.
Push the cap with the hose shank
into the hose and tighten the
clamp.
Install the nozzle cap to the main
sprayer.
8
#6J - Clamp
25608-1-NYR - Cap & Gasket
8400-500-NYB - Hose Shank
Road Transport
On some machines, the Redball hood section may extend wider than the booms in the transport
position. It may be necessary for you to add additional hazard warning lights.
Also check that the SMV sign is still visible on the machine after your hoods are mounted.
Relocate the SMV sign if needed.
REDBALL-HOODED SECTION
BOOM
BOOM
SPRAYER
Summary of Contents for SPK-6
Page 1: ...Serial Number SPK 6 Assembly Instructions Broadcast Hooded Retrofit Kit 10 ...
Page 8: ...NOTES 6 ...
Page 9: ...7 Parts Reference Materials Assembly Retrofit Kit 10 ...
Page 14: ...NOTES 12 ...
Page 15: ...NOTES 13 ...
Page 16: ...NOTES 14 ...