5
1.1.2 Unpacking the Cabinet
To unpack the system:
1. Open the outer carton and remove the accessories packaged with the
cabinet.
2. Carefully lift the cabinet out of the outer carton and set it on a flat, stable
surface.
3. Discard or recycle the packaging in a responsible manner, or store it for
future use.
1.1.3 UPS Setup
All model series are designed for tower and rack purpose. They can be
installed into a 19 inches equipment rack. Please follow the instruction for
Tower Setup and Rack-Mount Setup.
Tower setup
This series of UPS can be placed horizontally and vertically. As a tower
configuration, it is provided with the optional UPS stands to stabilize the UPS
when the UPS is positioned in vertical. The UPS stand must be attached to the
bottom of the tower. Use the following procedure to install UPS in UPS stands.
1.
Slide down the UPS vertically and put two UPS stands at the end of the
tower.
2.
Place down the UPS into two stands carefully.
3.
Pull out the LCD box and rotate it in a clockwise direction to 90 degree and
then push it back in the front panel
.
www.redeal.pt
sales@redeal.pt