AN-50 User Manual
15/52
Red
line Communications
…..solving the first mile challenge
.
Orientation
Arrow
For building mounts, ensure the surface to which the mounting bracket will be
attached is flat and vertical (use a level). Install the bracket using four lag screws,
with washers. There are two center holes that can be used to mount the bracket
onto a 2x4 stud. Make sure the surface to which the bracket is attaching is
structurally sound and can withstand the specified wind loading.
Lag Screw
and Washer
Figure 5 Mounting the antenna on a building structure.
Once the antenna is mounted, it has to be aligned in both the azimuth and
elevation planes. The elevation alignment is accomplished by loosening the two
bolts attached to the mounting bracket, as shown in Figure 6, and slanting the pole
until the antenna is aligned in elevation towards the remote terminal. The azimuth
alignment is achieved by loosening the two bolts on the antenna bracket, and
rotating the antenna until alignment is achieved.