background image

WELDED FRONT SUPPORT

AA

3/8" CARRIAGE BOLT 2.25" LONG

FIGURE 10.1

FIGURE 10.2

3/8" FLANGE NUT

STEP 1

: With the Stand built, find the Welded Front Support AA. Slide the Front Support over the front of the 

stand as shown in Figure 10.1. Make sure the wider top flange is facing up as shown in Figure 10.2.  Once the 

Support is pushed all the way in place the cross bar should hit with the front of the stand. With the Support in 

place secure it with a 3/8" x 2.25" long carriage bolt, you will use one of the (2) holes as shown in Figure 10.2. If 

your stand has a channel across the front you will use the farther one and if your stand has a tube at the end of it 

you will use the closer one. Install the bolt going from the top down and secure on the bottom side with a 3/8 

flange nut finger tight. Do this on both sides to keep in place during assembly. 

-3-

Summary of Contents for RD-STD68BR

Page 1: ... at 877 523 9986 for replacement of missing or defective parts NOTE Some parts of this product are manufactured to be universal in use so there may be some parts containing holes that will not be used in the assembly of this particular model To minimize confusion in the assembly process please read these instructions in their entirety before beginning Should you have any questions about the assemb...

Page 2: ...PORT LOWER LEFT 2 CC VERTICAL SUPPORT UPPER LEFT 2 DD VERTICAL SUPPORT LOWER RIGHT 2 EE VERTICAL SUPPORT UPPER RIGHT 1 3 8 16 X 2 LONG HEX BOLT 2 3 8 WASHER 2 O D 2 3 8 FLAT WASHER 2 3 8 LOCK WASHER 2 3 8 16 HEX NUT 2 3 8 16 X 2 25 LONG CARRIAGE BOLT 4 3 8 16 X 1 LONG CARRIAGE BOLT 12 3 8 16 LOCKING FLANGE NUT 16 TOOLS REQUIRED NOT INCLUDED 2 9 16 SOCKETS OR WRENCHES DRILL WITH 3 8 DRILL BIT 2 ...

Page 3: ...ushed all the way in place the cross bar should hit with the front of the stand With the Support in place secure it with a 3 8 x 2 25 long carriage bolt you will use one of the 2 holes as shown in Figure 10 2 If your stand has a channel across the front you will use the farther one and if your stand has a tube at the end of it you will use the closer one Install the bolt going from the top down an...

Page 4: ...ether with the 8 3 8 16 x 1 Carriage Bolts as shown in Figure 11 2 There will be 4 bolts on each Vertical Support With the flange on the outside place the bottom of the porch support behind the top perimeter rail see Figure 11 3 With the bottom of the Porch Support attached secure the top of the porch support with the 2 25 carriage bolt as shown in Figure 11 4 Repeat these steps for the other side...

Page 5: ...nt of the 6x8 Support as shown in Figure 12 2 Take your drill and 3 8 drill bit and drill through the bottom of the floor up through the top of the floor making sure to stay centered between the slot Once both holes are drilled insert the 3 8 bolt and large washer down trough the floor Secure on the bottom side of the stand with the 3 8 washer lock washer and nut Once both are in place make sure t...

Reviews: